More flooring and quality time with the Little Man.

It was just a twelve hour work day. I did all of the flooring on the ground level of unit two. Tomorrow the marble guys are supposedly returning and I will be able to finish the lower level of unit four and hopefully do all of the lower level on on unit one. It wasn’t too hot today, but I did run the fan.

Luke was pretty relaxed this evening. I played with him on the bed for quite a while. He smiled a lot. And peed a lot.