Passing inspection and covering walls.

I arrived at the job site at seven this morning, unloaded the tools, and got all set up to work. Then I waited for the inspector. He arrived just before nine and gave me the thumbs up. I started work on the walls but needed a rubber mallet, so I went to the lumberyard. They didn’t have any for sale but did loan me one from the paint department. back at the house I worked until about 2:15 and made decent progress. I stopped by the Goat Market and ordered a pizza, went to the cottage to pack up, returned to the Goat Market and ate some of the pizza, then hit the road. I stopped at Home Depot in Manchester to buy some nails, then drove on home. Luke and Liz were playing outside when I arrived, but then we came in and built a Lego tower before dinner. After dinner we cleaned up and Luke took a bath, then I showered. I was just starting to relax when Liz said that she needed a color inkjet printer to print an iron-on think for Luke’s Halloween costume that he will wear to school tomorrow. So I drove up to Target in Spring Hill and got one. Now she is messing with it and I am not sure when I will be able to go to bed.