Weather cooling down, cedar wrapping up.

I didn’t fall asleep until after four this morning, woke up about six-thirty, and got out of bed around eight-thirty. I arrived at the house just before nine. It was a little chilly so I fired up the propane heater. This morning was actually as warm as it got – the temperature continued to drop throughout the day. I started by installing the ceiling in the “utility room” before moving to the second bedroom. Next came the “flex room”, but after just a few boards I went to the Goat Market for pizza. I actually ended up getting it to go, since there were more people there than expected at 3:30. I did chat with Eric for a few minutes while I waited. Back at the house I finished up the flex room ceiling and started on the small closet. One issue is that a lot of this cedar isn’t of great quality, so I’ve really had to pick through it and cut out a lot of waste. I will probably need to bring some from home in order to finish up the closets. Tomorrow I hope to do the bathroom ceilings, finish as much of the closets as the wood allows, finish the last run on each room, haul trash to the dump, and load up all of the scrap wood. It would be nice to get away fairly early in the afternoon.