Painting.

It was a long and intense day, but I survived. This morning I loaded up all of my materials and equipment and headed to the job site. After unloading I needed to get some plexiglass, which I found at the lumberyard after failing at Ace Hardware. It took a bit of time to get everything set up and the sprayer running, but once everything started going I was off to the races. The first house went well despite taking a while. The second went okay until about half way through at which point I was drained. From that point it took another three hours until I was finished. I sort of picked up the job site then went to CVS for about a gallon of drinks. Back at the cottage I showered and relaxed a little bit before driving home. It is about 10:45 now and everybody is asleep.