The flooring begins.

It was a pretty scattered day. The one constant was cold temperatures. I headed to get some trim first thing this morning. The insulation guys were at the house when I returned, and my dad said that we needed to get the cedar on the front porch so they could proceed. So we started on that and it was incredibly cold and windy. Fortunately the new propane heater was running inside the house, so we could at least go in to warm up. I wasn’t too pleased with how the cedar went up, mostly due to the side of the house being a little wonky. Eventually the insulation guys finished under the house and said not to worry about the porch, since the garage wasn’t finished either and they couldn’t do it. So I did a little more until it got too cold and I couldn’t take it any more. Next I went and got some of my flooring. It started to go down pretty well. Liz came in the early afternoon to look at exterior paint options, and made a decision. Blanched pine. After she left I continued to work on the flooring until I ran out of daylight. My dad was putting the trim around the windows and it looks fantastic. We went to dinner then to Home Depot in Spring Hill where we bought cement board for the master shower, and tried to buy a kitchen sink but they didn’t have it in stock. Liz went to Southeastern Salvage after leaving here and was able to buy the countertops. I’ll pick them up on Thursday. I’ll also get bathroom tile and grout then. Tomorrow it’s supposed to rain all day, but I still need to go get more trim in the morning. Then I’ll finish up the apartment flooring and then put backer board on the walls of the master shower and on the floors of all the bathrooms. I’ll probably finish the day by putting down underlayment where I can. My dad will keep trimming out the windows and then probably do the baseboards and all of the window and door trim in the apartment. Tomorrow will be another very cold and nasty day.