Kind of another off day.

Liz went to get tested for the virus this morning because she was worried she might have it. She did not. Madeline came at ten to watch Luke so Liz and I both napped in the apartment. She felt pretty bad and I felt just a little off. After rising we went for a late lunch at Panera Bread in Spring Hill. The food took a while so they gave it to us for free. We took a long, scenic route home, where Luke was waiting for us. Liz rested some more and I took the mower to Kubota, then did some computer work until Madeline left. We built more towers and he went outside some with Liz. He is taking a bath now and I will probably put him to bed.

Kind of an off day.

Luke seemed to be feeling a bit better this morning, but Liz felt worse, and I didn’t feel great either. Nevertheless we all went to Kroger. Upon returning Luke and I played with Legos and then ate lunch. He didn’t really nap so we went for a car ride and he eventually fell asleep. He woke up as we were going to Kroger to get a few things we forgot this morning. We played more and had dinner back at home. Liz bathed him and then I did the rest of the bed time routine. He was pretty amped up and didn’t want to sleep. I left his room after nine and we was still awake. Liz is going to get tested for the virus in the morning.

Kind of a low key day after a wild night.

Luke went to bed without issue last night, but woke up about 1:15 with a fever and throwing up. He was kind of freaked out, but calmed down when we set up a mattress in his room so that Liz could sleep in there with him. This morning he was doing much better and seemed pretty normal other than a slight fever. We went to the farmers market, but Luke and I drove in the parking lot while Liz shopped. He loved being able to steer. Back at the house we built Lego towers and video chatted with my parents. He took a great nap after lunch and later this afternoon we went on a drive to see some construction equipment. We talked with Aunt Lauren this evening, then had dinner and the usual bed time routine. Liz is putting him down now and soon I will make a quick trip to Monteagle to get a few things.

Early start, early finish.

My dad and I got to the job site around seven again this morning. We finished the siding in about four hours, and put on some of the window pieces before he had to leave. I finished them myself. After loading up the tools and taking them to the storage unit I returned to the cottage to shower, clean, and wash clothes. While the clothes were drying I went next door to see Debbie and Charles for a few minutes. I hooked up my trailer and drove home around four, arriving a couple of hours later. Luke and I played with Legos until dinner. I did bath with him after and Liz put him to bed. She thinks he is coming down with something.

The heat has arrived.

I played with Luke a bit this morning and left home a little later than I would have liked, around 7:30. After stopping for gas I had an uneventful drive to the cottage, where I changed clothes and went to get no ethanol gas for the generator. My dad was waiting for me at the job site when I arrived. We first finished the siding on the front of the house, which was slow and difficult due to the height and numerous cutouts over the windows. Next we finished the far side. The heat and sunshine were pretty draining, and I had to run to CVS for some drinks in addition to the water I had on hand. We started just a little on the last of the back of the house, but I was pretty maxed out at that point, so we just put the trim pieces under the windows and called it a day. After showering we had dinner at the Mexican restaurant a few doors down. The food was mediocre and the service worse, as expected. Now I am just kind of a zombie on the couch. We should finish up the siding tomorrow morning.