Busy but unproductive.

This morning I took my trailer and picked up the interior doors. I took the trailer home then went to therapy. I drove to the Mountain afterwards and arrived just as Douglas was finishing up the electric trench. I unloaded the doors and brought over the water heater and final toilet. After finishing work I went to Piggly Wiggly for some food.

Hammerin’ it.

Douglas’s friend Reese brought out his excavator and hammer today and they went to town on the sandstone. I ripped tome cedar for the trim. The electricians came by to install some fixtures. I drove home and made it in time for dinner. Luke was in a good mood.

Diggin’ it.

Douglas the excavator showed up this morning and started digging the septic tank. He hit rock just a couple of feet down. He is going to have a buddy of his bring out another machine with a rock hammer. I installed some base boards and corner pieces. The weather was nice.

Back to flooring.

I slept well last night and got to the job site early. It was a nasty, rainy day, but not cold. I was able to install the laminate in the third bedroom. The work day ended about three and I went back to the cottage and relaxed. This evening I had dinner with Dan at Shenanigans.

Another new adventure.

This morning we drove down to David Crockett State Park in Lawrenceburg. There were two playgrounds Luke enjoyed, then we ate a picnic lunch. Next we hiked some to a waterfall and finished at the owl/hawk cages. Luke had a lot of fun. After dinner I drove to the Mountain via Lynchburg.